How RTK Conversion Financing Works
From online application and 15-point engine diagnostics to certified workshop installation, driver training, and repayment through fuel savings.
RTK GLOBAL RESOURCES LIMITED
Certified Autogas Engineering • Structured Hire-Purchase • Sustainable Transport Transition
RC No: 1840571
Inspection Hub: Oluwakemi Zone, Olorunsogo, Amuloko Road, Ibadan
PCNGi & SON Certified Benchmarks
A Proven, Transparent Journey from Application to 100% Ownership
At RTK Global, our conversion financing workflow is engineered to be swift, transparent, and completely free of predatory loan terms. We handle the technical certification and pay the installation workshop directly so you can start cutting fuel expenses immediately.
The 6-Stage Conversion & Financing Roadmap
Digital Application & Document Submission
Stage 01Apply online in under 10 minutes with zero paperwork queues.
- Create a secure customer portal account with your name, phone number, and email.
- Provide your National Identification Number (NIN), driver's licence, and vehicle particulars (registration and roadworthiness).
- Nominate two reliable adult guarantors (NIN and contact details).
- For Keke operators, submit your Park Chairman details and operational garage affiliation.
- Pay the assessment fee (₦5,000 for Keke / ₦10,000 for cars) to initiate KYC and technical screening.
15-Point Pre-Conversion Vehicle Diagnostic
Stage 02Rigorous mechanical and safety inspection at an accredited workshop.
- Bring your vehicle to our certified workshop in Ibadan for a scheduled 45-minute technical diagnostic.
- Engine compression test to verify cylinder integrity and internal mechanical health.
- Confirmation of engine specifications (strictly 3 to 4 plugs/cylinders; no 6- or 8-cylinder engines).
- Electrical diagnostic: Alternator charging output, battery health, and wiring loom safety.
- Chassis and trunk structural inspection to ensure secure mounting of the high-pressure gas cylinder bracket.
Financing Approval & Equity Deposit
Stage 03Transparent offer letter, contract signing, and kit hardware allocation.
- Upon successful diagnostic and guarantor verification, our credit team generates your formal Offer Letter.
- Review your exact daily installment schedule (Monday to Saturday, with Sundays strictly non-billing).
- Sign the Master Hire-Purchase Financing Agreement electronically or in person.
- Pay your initial equity deposit (₦50,000 for tricycles; 10% for motor vehicles) directly into RTK's verified corporate account.
- RTK disburses kit hardware funding directly to the Certified Conversion Workshop.
Certified Conversion Installation & Pressure Testing
Stage 044 to 6 hours of precision engineering by PCNGi-trained automotive specialists.
- Mounting of the heavy-duty, crash-tested composite/steel CNG cylinder securely in the trunk or rear subframe.
- Installation of the sequential gas regulator/reducer to step down 200-bar gas pressure to 2-bar engine injection pressure.
- Fitting of the dedicated Italian/OEM gas injectors into the intake manifold.
- Integration of the standalone CNG Electronic Control Unit (ECU) mapped to your engine's firing sequence.
- 200-bar nitrogen leak and pressure testing using certified electronic gas-sniffing sensors.
OBD Calibration, Safety Training & Dual-Fuel Handover
Stage 05Test drive, dual-fuel switch training, and official safety certification.
- Dynamic road testing with OBD-II real-time data logging to achieve petrol-equivalent engine power and torque.
- Hands-on driver induction: Operating the dashboard fuel selector switch (switch seamlessly between Petrol and CNG at any speed).
- Understanding the LED fuel gauge and cold-start petrol-to-gas transition protocols.
- Refueling safety induction: Station grounding, authorized filling pressures, and emergency shut-off valves.
- Handover of the vehicle with 12-month cylinder warranty certificate.
Commercial Driving, Repayment & Title Discharge
Stage 06Pay easily from massive fuel savings and take 100% full ownership.
- Begin driving on CNG, immediately slashing your daily fuel expenditure by 65% to 75%.
- Make your agreed daily installment (Mon–Sat) via bank transfer and upload your receipt in the customer portal.
- RTK reconciles and credits your payment ledger within 2 to 4 hours, sending instant SMS/Email updates.
- Enjoy Sundays completely payment-free for rest, family, and vehicle care.
- Upon your final installment, receive an official Certificate of Ownership Transfer and total lien discharge.
Anatomy of the Certified CNG Conversion Kit
Every vehicle converted under RTK Global financing receives brand-new, premium European/OEM standard sequential components engineered for maximum safety, thermal resistance, and long-term durability.
High-Pressure CNG Cylinder
Seamless steel or composite Type 1 / Type 2 tank certified to 200–250 bar (3,000+ PSI). Features thermal pressure relief devices (PRD) and shatter-proof burst protection.
Sequential Gas Reducer
Two-stage heated regulator that steps down extreme cylinder pressure from 200 bar to a safe, steady 2 bar for precision engine injection.
Autogas Electronic Control Unit (ECU)
Microprocessor that mirrors your vehicle's factory petrol computer, calculating exact gas microsecond injection timing for maximum fuel efficiency and zero engine knock.
High-Speed Gas Injector Rail
Ultra-fast solenoid injectors calibrated to deliver micro-metered gaseous fuel directly into the combustion ports, maintaining smooth idle and rapid acceleration.
Dual-Fuel Selector Switch
Dashboard-mounted switch with LED tank volume indicator. Lets the driver toggle between CNG and Petrol at the touch of a button, even while driving at highway speed.
High-Pressure Steel Piping & Safety Solenoids
Seamless stainless steel gas lines with double-armored protection and automatic electromagnetic safety valves that lock fuel flow whenever the engine stops.
Dual-Fuel Architecture: You Are Never Stranded
Our conversions are 100% dual-fuel. Your original petrol tank, fuel pump, and petrol injectors remain fully functional and intact. If your CNG cylinder runs low while you are far from a gas filling station, you simply flick the dashboard switch to Petrol and keep driving without even stopping the vehicle.
What Happens on Conversion Day?
Arrival & Pre-Check
Arrive at 8:30 AM at the accredited installation hub. Technicians confirm kit components, tank brackets, and serial numbers.
Precision Fitting
Cylinder mounting, regulator fitting, injector rail installation, and high-pressure piping routed safely away from the exhaust system.
Calibration & Release
Nitrogen pressure testing, station gas fill, OBD-II dyno calibration, driver safety briefing, and official vehicle handover.
Conversion installations are carried out strictly by certified autogas engineers using PCNGi/SON-approved hardware. Vehicle release is conditioned on successful pressure leak tests and OBD-II calibration.
